Fully mounted on a support frame with the following main components:
- Flocculation unit
- Flotation unit
- Flocculant preparation unit
- Electric control cabinet
Plug & play principle due to the following additional components:
- External feed pump
- Flow measurement
- Automatic ph measurement & control including a dosing pumo and neutralizer agents
- Coagulant dosing pump
- Compressor
All system parts are piped and wired, so ready for operation.
Piping/Hoses between the components for the pilot skid are included! The system is supplied with additional hoses and standard couplings for on-site connection. The following hoses are supplied:
- 1 x 6 m hose for wastewater inlet
- 1 x 5 m hose for wastewater effluent
- 1 x 5 m hose for sediment draining
- 1 x 5 m hose for sludge removal