Wastewater solutions for the largest NGL processing plant at Hawiyah to recover ethane and NGL from approximately 4 billion standard cubic feet per day of sales gas

The state-owned oil company of the Kingdom of Saudi Arabia

Situation

This project is ordered by JGC Japan. The CPI units are placed at the ARAMCO Hawiyah natural gas recovery installation near the Ghawar field. 

Request for information Contact us


Profitable Solution

To treat the water two (one duty and one standby) CPI oil/water separators are installed.  The units separate all free oil with a diameter of > 50 micron. The separators are executed with a AISI 316 corrugated plate pack. 

About this project

Customer: Contractor of ARAMCO
Time frame: The project was completed in 2007

Highlights

  • The units are designed and built in Carbon steel.
  • The units are coated  internally and externally.
  • The plate packs are complete made of AISI 316. The units are built following the ARAMCO specifications.
     


Do you want to know more about our solutions?